
Indore Metro Work Resumes After Protest
The story in brief
Indore Metro construction resumed at Malharganj after a temporary suspension due to resident protests over alleged vibrations from excavation work. Officials conducted safety inspections, finding no structural damage, and assured residents their concerns would be addressed. Urban Administration Minister Kailash Vijayvargiya visited the site later in the night, while the project includes compensation for verified property damage.