
PM Modi flags off Chennai Metro’s 15-km Phase-2 stretch with 3.7-km double-decker
The story in brief
Prime Minister Modi flagged off the Poonamallee-Vadapalani stretch of Chennai Metro Phase-2, a 15-km route with 11 elevated stations, including a 3.7-km double-decker section that will not operate on Sundays. The project, costing around Rs. 13,000 crore, features advanced signalling for driverless operations.