
Panthalkudi canal debris raises flood concerns in Madurai
The story in brief
Residents in Madurai report debris from retaining wall construction partially blocking the Panthalkudi canal, restricting water flow. The Water Resources Department is restoring the canal, which is a key flood carrier. A 2 MLD collector well exists, but damaged pipelines are being repaired. The corporation has allocated funds for desilting multiple canals and identified 140 waterlogging-prone areas for mitigation.