
Nepal-Bahraich Rail Line Converted to Broad Gauge
The story in brief
The Nepalganj Road-Bahraich rail section, originally built in 1886, was converted to broad gauge and electrified at a cost of Rs 730 crore. The project, inaugurated by Uttar Pradesh Chief Minister Yogi Adityanath and Union Minister Ashwini Vaishnaw, connects the region to India's wider railway network and improves connectivity for people in Nepal. A two-minute silence was observed for flood victims in Nepal.