Sikkim Group Demands Halt to Hydropower Projects After Nepal Floods
The story in brief
A mudslide in Tibet’s Gyirong port triggered high-speed flash floods that damaged roads, power projects, and villages in Nepal, including the 111-megawatt Rasuwagadhi Hydropower Plant. The disaster prompted the Sikkim Bhutia Lepcha Apex Committee to urge Prime Minister Narendra Modi to halt new hydropower projects in Sikkim and conduct an independent inquiry into existing ones, citing ecological and social risks to the Himalayan region.