Thoothukudi Corporation intensifies monsoon preparedness ahead of northeast monsoon
The story in brief
Thoothukudi Corporation is intensifying monsoon preparedness by desilting 350 km of stormwater drains, including 1,202 culverts, and addressing illegal discharges. Warnings against illegal connections have been issued, with UGDS works completed in 34 wards. The city, located below sea level, is also inspecting 37 pump rooms and 50 motor pumps, while widening Puckle Canal to prevent flooding ahead of the northeast monsoon.