
Footbridges a boon in Karnataka's Malnad as rains swell water bodies
The story in brief
In Uttara Kannada, 87 footbridges have been built, with 49 more under construction to help residents and schoolchildren cross swollen water bodies during monsoons. A proposal for 100 more bridges in Sirsi has been submitted. H D Kumaraswamy directed bridge construction in the Malnad region. Locals say dry ditches become dangerous streams, making travel perilous. The MLA said more bridges would be proposed if needed.