85% Canal Desilting Done: Collector Reports Progress to HC
The story in brief
The Ernakulam District Collector reported to the Kerala High Court that 85% of city canal desilting is complete, with the Mullassery Canal’s remaining 175-metre stretch set for completion. Funds have been allocated to shift utilities from the canal, and a sluice gate was built to combat flooding. A joint inspection last year highlighted ongoing waterlogging issues, with work expected to resume after the rainy season.