Isro Engine Test Validates High-Power Capability for LVM-3
The story in brief
Isro’s latest engine test, conducted at the Propulsion Complex in Mahendragiri, successfully validated the SE2000 engine’s ability to stabilize after ignition and sustain high power levels. The PHTA, missing only the thrust chamber, reached 400-500 bar pressures, marking a key step toward the semi-cryogenic SC120 stage for the LVM-3 rocket, which is India’s most powerful operational vehicle.