Chennai Metro Rail’s phase 2 corridor cuts through MRTS station roof
The story in brief
Chennai Metro Rail’s phase 2 corridor runs over the Adambakkam MRTS station roof, using steel I-girders due to the existing railway line beneath. Construction, which began last year and lasted three months, involved dismantling parts of the station roof and installing temporary beams block by block. The alignment passes over the cloverleaf flyover and phase 1 corridor at Alandur, allowing Metro trains to run perpendicularly above the MRTS track.