
Approach road to Dehradun bridge caves in after heavy rains, repair underway
The story in brief
Heavy rains caused the newly built approach road to a bridge in Dehradun’s Premnagar to collapse on July 28, 2026, disrupting traffic. The temporary bridge was constructed after the previous one was damaged in September 2025. Officials confirmed the main bridge structure remained intact, but torrential rains washed away soil beneath the approach road, causing it to sink. Technical teams are working to restore the road as quickly as possible.