
Two Substations Planned in Gurugram to Ease Power Load
The story in brief
HVPNL has approved two 66kV substations in Sushant Lok Phase 1 and Sector 50 to address rising electricity demand. The existing substation in Sector 28 is nearing capacity, risking overload due to rapid development. The projects, costing ₹90–95 crore, aim to improve supply reliability and free up space for future infrastructure.