
Mumbai Metro-5 First Train Arrives at Kasheli Depot
The story in brief
The first train has entered the Mumbai Metro-5 Kasheli Depot, part of the MMRDA, marking progress on the Thane–Bhiwandi–Kalyan corridor. The 27-hectare depot, featuring a coach loading platform and temporary inspection bay, will serve as the base for 30 trainsets. The depot's completion signals advancing preparations for the metro line.