
Elevated Corridor to Cut Thane-Navi Mumbai Travel Time to 30 Minutes
The story in brief
CIDCO is building a 25.287 km elevated corridor from Thane to Navi Mumbai International Airport, aiming to slash travel time from over 90 minutes to just over 30 minutes. The corridor will use existing roads, flyovers, and greenfield roads, starting at Patni near Airoli Knowledge Park and ending at NMIA. The first stretch, the 1.4km Kopri-Patni Creek bridge, is under construction by MMRDA. The project, funded by toll revenue, will reduce congestion on Navi Mumbai’s roads and ease traffic along Palm Beach Road and Thane-Belapur Road.