
Atal Setu Connector Near Completion, Cutting Mumbai-Pune Travel Time by 90 Minutes
The story in brief
The Atal Setu Connector, a 7.35-km elevated corridor, is 67% complete, aiming to bypass Panvel junction and cut travel time between Mumbai and Pune by 60-90 minutes. Construction is progressing in Navi Mumbai, with the project set to improve traffic flow and regional connectivity. The MMRDA plans to link individual projects to enhance mobility.