
Mumbai's GMLR Project Advances As 2nd TBM Joins Excavation Of Twin Tunnels
The story in brief
Mumbai’s GMLR project reached a key milestone with both tunnels beneath Sanjay Gandhi National Park now underway. The second TBM, ‘Vihar’, began tunnelling after passing its Site Acceptance Test, joining the first machine, ‘Tulsi’, which has bored 270 metres. The twin tunnels will span 6.675 km, including 5.34 km of TBM-driven excavation, transforming east-west connectivity and cutting travel time from 90 minutes to 20 minutes.