BDA clarifies Ballari Road won’t be fully closed for 18 months
The story in brief
The BDA confirmed Ballari Road will not be fully closed for 18 months during elevated corridor work. Limited lane restrictions and phased traffic diversions will apply, with barricading restricted to a 4.5-metre-wide lane. Heavy vehicles will face restrictions between 6 a.m. and 8 p.m. The project aims to ease congestion along the northern corridor connecting Bengaluru with Kempegowda International Airport. The BTP has requested the GBA and BDA to asphalt alternative routes, which are currently in poor condition.