MSRDC Repairs 100m Road Before Connecting Link on Pune-Mumbai Expressway
The story in brief
Motorists flagged a deteriorating road before the Connecting Link on Pune-Mumbai expressway, prompting MSRDC to start repairs with epoxy asphalt. Commuters questioned why the approach road to a new infrastructure link was allowed to deteriorate and called for a thorough maintenance audit of the entire 94km expressway. MSRDC officials stated inspections and maintenance of the entire expressway were carried out regularly as per prescribed norms.