
Adani firm to build Bengaluru's first double-decker rail line for Rs 665.61 crore
The story in brief
Bi-RIDE awarded Cemindia Projects Limited the Mallige Line contract after L&T exited in 2025. The 7.795-km elevated line will connect Benniganahalli to Shettihalli, with a double-decker station at Mathikere. The project aims to open by December 2028.