₹80-crore stormwater drain to ease flooding in Korattur
The story in brief
Residents of Central Avenue, East Avenue, and TNHB Colony face annual flooding during monsoons, prompting a ₹80.25 crore stormwater drain project in Korattur. The first phase, a 2.44-km stretch costing ₹40.36 crore, is underway with 1.8km completed, aiming to divert runoff and reduce flooding in TNHB neighbourhoods. Finalisation of phase 2 design will follow survey results to connect to the Cooum.