Question Everything. See who's reporting it.

Chennai: Basin Bridge widening to cut travel time to 4 minutes

Source: DT Next

The story in brief

The State Highways Department has floated tenders for detailed project reports on widening the Basin Bridge and a Cooum River bridge. The Basin Bridge widening was triggered by a petition to the Chief Minister’s Office and is expected to reduce travel time from 20 minutes to four minutes. Traffic congestion in North Chennai is anticipated to ease with the bridge expansion.

NEWXFree on Android and iPhone. Open in NEWX