
Mumbai: BEST Overhauls 300 Km Power Cables By 2029
The story in brief
BEST plans to replace 300 km of ageing power cables in Mumbai, following a fire in Bhuleshwar caused by a suspected short circuit. The project, valued at ₹200 crore, targets 1,200 critical locations affecting 10.5 lakh consumers. Work is set to begin by December 2027, with the tender expected to be awarded shortly.