
GBA Proposes Roads Along Lakes to Ease Bengaluru Traffic
The story in brief
The GBA and BDA have proposed hundreds of kilometers of roads along stormwater drains, lake buffers, and water bodies, raising environmental concerns. Potential impacts include reduced water-holding capacity in lakes like Puttenahalli and increased water scarcity risks. The 60-day objection period ends on 2026-12-22, with integration into the Revised Master Plan 2015 planned for the same date.