Question Everything. See who's reporting it.

Kasara Line To Get 18 New 15-Coach Services Post-Diwali

Source: Free Press Journal

The story in brief

Central Railway plans to add 18 extra 15-coach local train services on the Kasara line after Diwali, replacing existing 12-coach locals to boost capacity by 25% per trip. Platform extensions at Titwala will be completed by November 15, 2026, alongside infrastructure upgrades along the Kalyan-Kasara section. Commuters from Kasara, Asangaon, Vasind, Khadavli, Titwala, and nearby areas will benefit from increased capacity during peak hours. The longer trains will allow more passengers to travel without increasing trips, raising the total number of 15-coach services on Central Railway to 72 once the 18 services are converted.

2 outletsSee what the other 1 outlet said

NEWXFree on Android and iPhone. Open in NEWX