
HMWSSB Repairs Damaged Krishna Phase-II Pipeline Valve
The story in brief
HMWSSB officials repaired a damaged air valve on the Krishna Drinking Water Supply Scheme Phase-2 pipeline after a car crash damaged the protective fence and valve near Nagole Metro Station. Drinking water supply to affected areas in Hyderabad was resumed following the repair. The valve system was restored within five hours, halting the leakage.