Central Railway commissions 13.5km Khardi-Kasara third line
The story in brief
Central Railway commissioned the 13.53km Khardi-Kasara third line after CRS inspection cleared it for 100kmph operations. The line, built through hilly terrain, will ease congestion and improve capacity on the Mumbai-Kasara corridor. The project included strengthening bridges and upgrading signalling.