
GCC to Landscape Cooum Riverfront
The story in brief
The Greater Chennai Corporation plans to landscape two stretches of the Cooum riverfront, covering 500 metres near Napier Bridge and 1.20 km along Sivanandha Salai. The projects, costing ₹50.52 lakh, include clearing vegetation, planting shrubs, and installing irrigation systems. The GCC aims to complete the work within a month and maintain the areas for 12 months, improving the appearance of Teynampet and Royapuram zones.