Question Everything. See who's reporting it.

NGT Demands DPCC Explain Groundwater Testing Gaps at Ghazipur Landfill

Source: Times of India

The story in brief

The National Green Tribunal sought clarity on DPCC's groundwater testing equipment shortage at Ghazipur landfill, citing media reports of a fire. DPCC admitted lacking the equipment and noted a tender was floated. The tribunal stressed the need for a fully equipped lab, with a further hearing scheduled for January 19, 2027. Residents near the landfill may face risks due to the testing shortfall.

NEWXFree on Android and iPhone. Open in NEWX