NGT Demands DPCC Explain Groundwater Testing Gaps at Ghazipur Landfill
The story in brief
The National Green Tribunal sought clarity on DPCC's groundwater testing equipment shortage at Ghazipur landfill, citing media reports of a fire. DPCC admitted lacking the equipment and noted a tender was floated. The tribunal stressed the need for a fully equipped lab, with a further hearing scheduled for January 19, 2027. Residents near the landfill may face risks due to the testing shortfall.