Question Everything. See who's reporting it.

Mumbai Metro 7A Resumes Amid Height Breach Near Airport

Source: Hindustan Times

The story in brief

Mumbai Metro Line 7A construction has resumed despite a 2.5-metre height breach near the airport. A design error near Vile Parle East caused a 1-km elevated stretch to be at risk of demolition due to height breaches. The breach could lead to potential demolition of a 1-km elevated stretch near the airport, affecting construction timelines and safety.

NEWXFree on Android and iPhone. Open in NEWX