Chennai Metro Phase II sees 25,474 passengers on day 1
The story in brief
The Chennai Metro Rail’s Phase II stretch from Poonamallee to Vadapalani opened on October 12, 2026, with 25,474 passengers using the new line. Peak traffic occurred between 5 p.m. and 9 p.m., with Poonamallee Bypass station seeing the highest footfall. Residents noted reduced commuting times but faced inconvenience due to the unopened Arcot Road entry/exit. The Arcot Road entry/exit is set to open next.