
MSRDC To Appoint Contractor For ₹1,722-Crore Pali Hill Sea Link Connector
The story in brief
MSRDC plans to appoint an independent contractor for the Pali Hill Sea Link Connector after CRZ approvals. The 3.55-km project aims to improve connectivity between the sea link and Bandra West, offering an alternative route for motorists. The connector will include a 1.269-km main carriageway and ramps, with ₹1,183.79 crore allocated for civil construction.