CMRS Completes Pink Line Safety Inspection in Bengaluru
The story in brief
CMRS completed a three-day safety inspection of the 7.5-km elevated Pink Line between Kalena Agrahara and Tavarekere. The inspection, led by V Venkatasubramanian, included motor trolley checks, depot review, train trials, and operations control centre evaluation. The elevated Pink Line will expand Bengaluru’s Metro network from 96.1km to 103.6km once it opens.