
Mumbai Local Train Block at Kasara from October 7 to 18
The story in brief
Central Railway will block Kasara for 12 days starting October 7, 2026, as part of the Asangaon-Kasara 3rd Line Project and UP Yard line extension. Suburban services between Asangaon and Kasara will be disrupted during the block, with several long-distance trains delayed by 35 to 40 minutes. The affected section includes platforms 1, 3, and 4 at Kasara.