Question Everything. See who's reporting it.

JDA to build two pedestrian subways on Mahal Road

Source: Times of India

The story in brief

JDA will construct two pedestrian subways at Akshay Patra Crossing and No 7 Crossing to improve safety along a 9 km stretch between No 7 Crossing and Bombay Hospital. The subways will allow pedestrians to see the entire passage from entry to exit, reducing risky crossings. Work is expected to start within 15 days.

NEWXFree on Android and iPhone. Open in NEWX