
Madras HC denies interim protection to EV Velu, son in lake-bed excavation FIR
The story in brief
The Madras High Court rejected interim protection for EV Velu and his son EV Kumaran in an FIR over lake-bed excavation for a DMK conference. The FIR, registered on September 24, 2026, alleges excavation of lake material between November and December 2025. The court directed the State Government and Arappor Iyakkam to respond, with the case set for November 6, 2026.