Safety inspection starts for Bengaluru Metro’s Pink Line elevated section
The story in brief
The statutory safety inspection of Bengaluru Metro’s Pink Line elevated section began on 2026-10-05, led by V Venkatasubramanian. The inspection covers six stations and includes a motor trolley check. BMRCL aims to open the section by October 30 after CMRS clearance. The elevated section will improve transportation in Bengaluru.