Mumbai Metro 2027: CM Fadnavis Fixes May 31 Deadline for Sewri-Worli Connector
The story in brief
CM Devendra Fadnavis directed authorities to complete 70km of metro corridors by 2027, setting May 31 as the deadline for the Sewri-Worli elevated connector. The connector will link the MTHL with the Bandra-Worli Sea Link, reducing travel time for motorists. MahaRail confirmed girder launching for the Prabhadevi ROB will be completed by November-end.