
Barapullah Flyover's Six Lanes Lead to Congestion
The story in brief
The Barapullah Phase 3 flyover opened four days ago, but its six lanes merge into a three-lane carriageway, worsening congestion at the merging point with the two-lane Phase 2 flyover. Delhi Police plans to manually manage lane merging using traffic lights and personnel based on drone data. Urban expert Hitesh Vaidya criticized the design, comparing it to shifting traffic to a higher floor.