
Bengaluru: Community Reduces Nallurhalli Traffic Jam
The story in brief
Residents and Whitefield Rising started a road-widening project to ease a peak-hour bottleneck causing 30-minute jams. A landowner allowed part of his property for the work, and a 40-metre stretch was concreted with crowdfunding. The initiative is part of a larger urban redesign plan to improve traffic flow and infrastructure.