Barapullah bottleneck worsens due to 90-degree merge flaw
The story in brief
The newly opened Barapullah Phase-III corridor has exposed a key design problem near the Sundial Park loop, where six lanes merge into two abruptly at a 90-degree angle, worsening congestion. Traffic police identified the junction as a major bottleneck during an aerial survey and plan to use barricades or cones to create a smoother merge. Commuters reported delays of up to an hour, with tailbacks extending several kilometres.