
Bengaluru East, North Intensify Flood-Mitigation After Heavy Rain
The story in brief
Bengaluru East and North city corporations intensified flood-mitigation efforts after heavy rain, identifying vulnerable areas and deploying temporary pumps. Railway works and construction have blocked natural rainwater flow, prompting temporary pumping at Hoodi railway underpass. Officials plan larger pipes and a 1.6-km canal to improve drainage.