
Barapullah Flyover Traffic Jam Stretches 3.5 km After Inauguration
The story in brief
Commuters faced a 3.5-km traffic jam on the first day of the Barapullah Phase-III flyover's operation, with delays extending into the afternoon. The flyover, expected to cut travel time between Mayur Vihar and south Delhi to 15 minutes, overwhelmed by 5–6 lakh vehicles. Traffic police manually regulated the flow as congestion persisted.