Storm-water drain near Virugambakkam canal to be finished in two weeks
The story in brief
Work on the storm-water drain near the Virugambakkam canal on Kaliyamman Koil Street is set to be completed in two weeks following an inspection by GCC Commissioner G.S. Sameeran. The project, part of broader development works in Kodambakkam zone, includes building retaining walls, fencing, and removing silt and waste, with a new bridge being constructed by Chennai Metro Rail Limited. Completion is expected to improve drainage and reduce waterlogging in the area.