GCC speeds up drain linking to cut flood risk at 68 spots
The story in brief
The Greater Chennai Corporation has accelerated work on stormwater drain links at 68 locations to lower flood risk, with 37 already completed. Officials are focusing on last-mile preparedness as the Northeast monsoon begins. Desilting of 1,683 km of drains is underway, with 1,102 km done so far.