
Floating solar park plan gains momentum at Kadra reservoir
The story in brief
Discussions for a floating solar power park at Kadra reservoir have gained momentum due to declining water storage impacting hydropower. The project, backed by KPCL and THDC, includes a 100-MW unit in the backwaters. A bathymetric survey confirmed the reservoir's suitability, with officials expecting a detailed project report soon. The plant could reduce emissions by 2.5 lakh tonnes annually, boosting Kadra's capacity from 150 MW to 250 MW.