
Chennai Metro Water: Online Only for New Connections
The story in brief
Chennai Metro Water reiterated that new water and sewerage connections must be applied for online. Residents in expanded GCC areas are advised to use the portal. Field engineers will inspect premises after submitting complete details. Charges vary based on built-up area and establishment type. IDC applies to buildings with G+2 floors and above, those with more than six residential units, and commercial buildings over 300 sq m. Applications will be processed within 15 days if details are correct. Payment must be made through the online portal.