
Thane Jambli Naka Drainage Reconstruction Gets ₹7.5 Crore Approval
The story in brief
Residents and traders in Jambli Naka face recurring waterlogging and flooding due to a 40-year-old stormwater drain that has narrowed from 10 feet to 1.5 feet. The issue was raised during the TMC General Body meeting, prompting a ₹7.5 crore sanction for reconstruction. Work on the covered drain will commence soon, with the municipal engineer informing about the funds on the same day.